Projects & Credentials

Work that speaks for itself.

From high-rise abatement in the heart of Boston to wetland permitting on a $300,000 private estate — every project is handled with the same standard of precision, compliance, and care.

Qualifications

Education

B.S. Environmental Science

University of Rhode Island

Education

MBA — In Progress

University of Rhode Island

Experience

12+ Years Field Experience

Working in the field since 2012

Specialization

Wetland Delineation

USACE & RIDEM regulatory standards

Specialization

Phase I & II ESA

Environmental Site Assessments

Specialization

Regulatory Compliance

State & federal permitting, NEPA

Selected Projects

A cross-section of the work — asbestos abatement, environmental permitting, insurance-backed remediation, and everything in between. Every project completed to code, on time, and without shortcuts.

Nancy Solomon Project — Boston, MA

Asbestos Abatement

Nancy Solomon Project — Boston, MA

One of the most technically demanding projects in our portfolio. This 20-story commercial high-rise in the heart of Boston required the full-scope removal of mastic adhesive and asbestos-containing materials across multiple floors — all within one of the most heavily regulated urban environments in New England. The scope included pre-abatement testing and material identification, complete furniture removal and protection of occupied areas, full asbestos abatement using state-licensed procedures, post-abatement cleaning and surface decontamination, independent air clearance testing to confirm safe re-occupancy, and compliant hazardous waste disposal and manifesting. Working in an active urban high-rise demanded meticulous coordination, strict containment protocols, and zero tolerance for deviation from regulatory standards. The project was completed on schedule and passed all air clearance benchmarks on the first test.

High-RiseMastic RemovalAir ClearanceBoston
Broadway Plaza — Providence, RI

Asbestos Abatement & Demolition

Broadway Plaza — Providence, RI

Broadway Plaza presented a uniquely complex challenge: a multi-story, occupied low-income housing complex in Providence where a devastating fire — followed by significant water intrusion — had compromised common areas and residential units across multiple floors. With tenants still in residence throughout the building, every phase of work required careful coordination to minimize disruption while maintaining the highest safety standards. The scope included comprehensive pre-abatement testing of all affected materials, development of a full abatement plan in coordination with the Rhode Island Department of Health (DOH) and the building owner, permit acquisition and regulatory compliance throughout, asbestos abatement across multiple floors and units, and general demolition of all fire- and water-damaged materials — leaving each affected unit structurally clean and ready for the rebuild team. The combination of an occupied building, multi-agency oversight, and the scale of damage across multiple floors made this one of the most logistically complex projects we have executed. Every unit was handed off on schedule and in compliance.

Occupied BuildingDOH CoordinationMulti-FloorProvidence
Guarino Residence — Rhode Island

Residential Abatement

Guarino Residence — Rhode Island

The Guarino project is a strong example of how the right expertise can turn a stressful situation into a seamless outcome for a homeowner. The property contained two layers of asbestos floor tile and mastic adhesive in the basement — a common but serious issue in older New England homes. Rather than leaving the homeowner to navigate the insurance process alone, we stepped in as a full advocate. Working directly with the homeowner's insurance carrier, we successfully structured the claim under the property's pollution and code coverage provisions — resulting in full coverage of the abatement and rebuild with zero out-of-pocket cost to the homeowner. The scope included asbestos testing and material documentation, insurance claim coordination and coverage negotiation, complete removal of both tile layers and mastic adhesive, and a full rebuild of the finished basement to pre-loss condition. The homeowner was left with a clean, fully restored basement and no bill. That outcome — protecting the client financially while delivering a compliant, professional result — is exactly what we aim for on every residential project.

Insurance ClaimTile & MasticBasement RebuildResidential
PC Housing — Providence, RI

Asbestos Abatement

PC Housing — Providence, RI

This large-scale abatement program involved a portfolio of over 500 student-occupied residential properties in the Providence College area — each requiring the removal of asbestos pipe insulation from basement mechanical systems. The occupied nature of the buildings, combined with the density of the portfolio and the presence of student residents, made this one of the most regulated and carefully managed projects we have undertaken. Every phase was executed in close coordination with the Rhode Island Department of Health (DOH) and required continuous air monitoring throughout the abatement process. Our approach included pre-abatement testing and documentation for each property, full containment setup with negative air pressure systems and decontamination units, state-of-the-art HEPA-filtered equipment and removal techniques, continuous real-time air monitoring to protect residents and workers, complete asbestos pipe insulation removal, and a final encapsulation coat applied to all basement surfaces as an added layer of protection. Working across hundreds of occupied homes simultaneously required military-level logistics, consistent crew training, and an unwavering commitment to resident safety. Every property passed final air clearance and DOH inspection.

Student HousingAir MonitoringNegative Air Pressure500+ Properties
Treehouse Permitting & Environmental Assessment — Rhode Island

Environmental Permitting

Treehouse Permitting & Environmental Assessment — Rhode Island

Not every project starts with a clean slate. The owner of a $300,000 private estate came to us after constructing a treehouse on their property without first obtaining the necessary environmental permits — a situation that can quickly escalate into costly fines, forced removal orders, or protracted legal disputes with state regulators. Our role was to build the environmental case for the structure's legitimacy and guide the owner through the after-the-fact permitting process from start to finish. The scope included a formal wetland determination to establish the precise boundaries of jurisdictional wetland areas relative to the structure, a native plant species assessment to document the existing vegetation community and evaluate any disturbance, a full environmental impact assessment examining the structure's effect on hydrology, habitat, and sensitive resources, and a professional recommendation — supported by field data — that the treehouse be permitted to remain in place rather than removed. Our documentation was thorough enough to satisfy regulatory review, and the structure was ultimately permitted. The owner avoided removal costs, fines, and the loss of a significant property investment. This project reflects the value of having an experienced environmental consultant who can navigate complex regulatory situations and advocate effectively on a client's behalf.

Wetland DeterminationNative Plant AssessmentAfter-the-Fact PermittingEnvironmental Impact

Have a project that needs an expert?

Whether it's a complex abatement, a permitting challenge, or an environmental assessment — let's talk through what you're dealing with and build a plan.